Modelling simulation using tecnomatix plant simulation 15
$30-250 USD
Pagado a la entrega
Sewing tool packaging production line. Every week will send products include the stuff require to pack the sewing tools. So, I need to build a model simulation that will determine how many days products will ready to ship back the factory.
Nº del proyecto: #30620675
Sobre el proyecto
1 freelancer está ofertando el promedio de $200 para este trabajo
Hi, please let me know the aspects of this project, the requirements, and if you have any documentation on what should be done. Thanks